Paddleducks Paddleducks

News:

Welcome to Paddleducks..... The home of paddle steamer modelling enthusiasts from around the world.

Main Menu
+-

Main Menu

UserBox

Welcome, Guest.
Please login or register.
 
 
 
Forgot your password?

Search

Building a river boat

Started by victor vector, February 09, 2015, 07:17:38 AM

Previous topic - Next topic
|

DamienG

Yes 31c today 30c tomorrow the it cools for the rest of the week.

victor vector

#91
The external door to the rear deck is almost complete.

Same construction as the windows , 3 laminations of 18 x 100 mm ( 3/4 x 4 inch ) hardwood epoxy glued together .










Marine plywood infill panel.



Hanging the recycled hardwood front door .



The pump-out and flush pipes coming up through the front deck.



2 x 6 treated pine screwed though 2 x 2 wall framing and hardwood decking with six and four inch batten screws ,and epoxy glued to keep pipes rigid and reduce stress to cemented pipe joints.Pipes were fitted in with a wooden block and hammer .There is a treated pine backing block screwed under the decking.




victor vector



Camlock pump out fitting.




Bottom to top :

50 mm DWV joiner.

50 > 40 mm reducer.

40mm threaded adaptor.

Camlock fitting.

Camlock fitting plug.




DamienG


derekwarner_decoy

Hullo PD's.....& always watching on Victor  :kewlpics......and robust construction in all areas   :bravo

However I must ask why you are using Master Foods Brand TOMATO sauce as glue  :tongue1

Keep up the good work & images......... Derek  :beer
Derek Warner

Honorary Secretary [Retired]
Illawarra Live Steamers Co-op
Australia
www.ils.org.au

victor vector

Hi everyone .

Derek ,about  those sauce bottles .....



I just found it too tiring to squeeze that glue out of that 20 liter bucket. :weight

derekwarner_decoy

Well that's OK Victor  :whistle...

I understand that the Titebond III is a brilliant glue  :towel   .....however having worked professionally with Lloyds and Det Norske Veritas in marine survey work, best destroy the images of Tomato sauce glue bottles .... Derek
Derek Warner

Honorary Secretary [Retired]
Illawarra Live Steamers Co-op
Australia
www.ils.org.au

victor vector

#97
Quote from: derekwarner_decoy on October 19, 2015, 06:44:07 PM
Well that's OK Victor  :whistle...

I understand that the Titebond III is a brilliant glue  :towel   .....however having worked professionally with Lloyds and Det Norske Veritas in marine survey work, best destroy the images of Tomato sauce glue bottles .... Derek

Yes Derek , I`m very pleased with the Titebond`s  performance .
The entire outside walls are covered with canvas set in the Titebond glue .
All 40 liters of it !
Nothing seems to touch the surface at all , from below freezing cold through 40 C heatwaves , relentless sun and occasional rain.
It still looks like the day I first made the wall panels.

Your days at Lloyds and Veritas sound interesting , and working in survey , you have probably picked up numerous mistakes I have made , that I`m not even aware of .Still , I`m doing my best to do a reasonable job given my limited budget  , but if I really mess up with something , feel free to kick my butt ..... :nono

victor vector

#98




Modified front door .

A hardwood stile was inserted at window height , and a rebate cut to accept the lower canvas covered plywood infill panel and glazing above.





Inside view.




victor vector

Lightweight metal covers for the pipework.






Top plywood cover will hinge for access to camlock fittings.


DamienG


victor vector

Thank you Damien .



I`m hoping when all is painted that the covers will not look too awkward and bulky.
If all else fails I shall resort to the old " put a pot plant on top and soften the look " trick ........ ;)

victor vector

#102


Insulating and fitting the eaves over the foredeck.



Some weird angles on those trim pieces.





I`m pulling the gutters apart and sealing the joiners with gutter sealant.

Manufacturer claims that they are water tight when just pushed together .
I tapped them together with a wooden block and hammer , making sure that they were fully seated .......you can guess the rest ?
Anyway , this should fix it.


victor vector

#104
Making the mandatory steel guards for the front of the waste water tank.





Setting out.

50 x 50 x 5 mm ( 2 x 2 x 3/16 ) mild steel angle welded together.







|
Powered by EzPortal
SMF spam blocked by CleanTalk