Paddleducks Paddleducks

News:

Welcome to Paddleducks..... The home of paddle steamer modelling enthusiasts from around the world.

Main Menu
+-

Main Menu

UserBox

Welcome, Guest.
Please login or register.
 
 
 
Forgot your password?

Search

Building a river boat

Started by victor vector, February 09, 2015, 07:17:38 AM

Previous topic - Next topic
|

DamienG


derekwarner_decoy

I will be interested to see where/how this Pot Belly is located in the vessel Victor......if fuel is not a cost issue, they produce a great heat output

You have a horizontal spade type flue throttle, the unit I had experience with used a rotary disk type throttle [you will need some asbestos type gloves to save the :ranting]

Having a brass flue chimney, this material in itself is a superb radiator [by convection] of heat if you can contain the heat in the chimney :whistle

Either way absolutely great for warming a semi insulated semi enclosed area......ideal for the coffee pot...with a little experience with the outer filigree belly ring...also great for cooking toast & anything you can fit in a small pan...... :06

Derek
Derek Warner

Honorary Secretary [Retired]
Illawarra Live Steamers Co-op
Australia
www.ils.org.au

victor vector

#197
Hello everyone.

I got a lucky break in the weather this morning , so I installed the chimney drop box.



There`s a big hole in the roof !



It fits ok .........





Double skin going through the ceiling .



I covered the air vent slots with fine metal mesh.



Inside the chimney liner.

Framing around the drop box is in place.





Checking ceiling plate for fit.







Bottom of the drop box is flush with the ceiling.

The rain stopped any more work ( on the roof) today , so thats it until next weekend.




victor vector

#198
I wasn`t going to do any more work until Saturday , but I went into the shed tonight , and did some more work on the ceiling plate .

I made a shallow surround for the ceiling plate and put some brass channel around the edges to make the plate a little more rigid.
It was bowing under its own weight !

The shallow sides are cut from a length of recycled galv. stormwater downpipe , and the brass channel came from an old trashed fire screen.



Cutting slots into the sides of the surround.

Folding the corners.







[/img]

Ceiling plate with brass channel fixed on.





External corner.



Upside down picture of what this will look like when put in place.

That was another two hours work believe it or not ......maybe I`m just slow  ::)



DamienG


victor vector

#200
8.2 Degrees C ( 46.7 F) outside , but toasty warm inside the cabin space.

:)





Fitting the ceiling panels into the frame.








DamienG


derekwarner_decoy

Very good Victor...we see plenty of Australian RED wood heater feed  :clap...but where is the  :coffee pot or the mmmmmmmmarsh mellows for toasting?  :hehe

Derek
Derek Warner

Honorary Secretary [Retired]
Illawarra Live Steamers Co-op
Australia
www.ils.org.au

victor vector

My stove top kettle is broken Derek  :(

Must get a new one.

DamienG

Great way to recycle scrap build timber mate.  :clap :clap :clap

victor vector

#205
It also helps with the clean up , burn it , and keep warm , rather than dump it .....  ;)

I must say , all that foam insulation is doing its job Damien , that little heater is almost overkill for the cabin , and it stays warm !

I`m very pleased  :beer

DamienG


Roderick Smith

Will this be finished for April?  RMBOA is running a ramble from Greenings to Moorook over 10 days, plus an express return for the large boats which aren't trailable.
Roderick.

|
Powered by EzPortal
SMF spam blocked by CleanTalk